More Progress

The Studio is moving right along.  The brick on the front has been completed and the bead board for the ceiling has all been painted.  The HVAC lines have been run and the interior electric is in.  Next step the ceiling will be installed, then lights, insulation and walls. Then the floor!

After

Leave a Reply

Your email address will not be published. Required fields are marked *